[{"id":"ci_c7cf5e5d26527010dbd39d6ce7c6684e061a2ff1ebe4995667d5c0c833045296","title":"WBS Gantt-Chart for Jira: Basic terms and concepts","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-basic-terms-and-concepts","children":[{"id":"ci_c16bb12cd048454b46502125c051b6badadf996589546a44951285d94ec9d169","title":"Information about Gantt","path":"/wbs-gantt-chart-for-jira-data-center/information-about-gantt","children":[{"id":"ci_b0eeb4a36cb0c01b50a85e74427950b9f53f3b07d81f0ce9269fccf44e57381c","title":"Information on the introduction of Gantt (for users upgrading from Version 8.7.0 and earlier)","path":"/wbs-gantt-chart-for-jira-data-center/information-on-the-introduction-of-gantt-for-users","children":[]}]}]},{"id":"ci_8d0bfd4bce0ca40b0f8026016ae60a22290bbff92af5a28dfdc8b280371cffb1","title":"Global settings - guide for system administrators","path":"/wbs-gantt-chart-for-jira-data-center/global-settings-guide-for-system-administrators","children":[{"id":"ci_146a025a6f0ed459850b3f599a3fc80e09c0cfc9a6fbb0434e4c691c01806113","title":"Guide for installing and upgrading WBS Gantt-Chart for Jira","path":"/wbs-gantt-chart-for-jira-data-center/guide-for-installing-and-upgrading-wbs-gantt-chart","children":[{"id":"ci_07b4d25867beb0ee8565c2f0d68a5e974f542068b882493d19aa83f81f846bdf","title":"Supported platforms","path":"/wbs-gantt-chart-for-jira-data-center/supported-platforms","children":[]}]},{"id":"ci_0457f73574a36b05657606078f7b9a3a407c2bc4cb2dc4db77a4562fc489b456","title":"System settings","path":"/wbs-gantt-chart-for-jira-data-center/system-settings","children":[]},{"id":"ci_e12dc1ed51ec069972b28e4c6e78200358c64061e288c431859bb94b33762422","title":"Feature settings","path":"/wbs-gantt-chart-for-jira-data-center/feature-settings","children":[{"id":"ci_835262d1728476e25960baea1da8a42ba130aabc289c5111e83bd300ad7d2bf6","title":"Global issue view settings - display mode, start/finish date, and percent done","path":"/wbs-gantt-chart-for-jira-data-center/global-issue-view-settings-display-mode-start-fini","children":[]},{"id":"ci_1bee0dec5a171fb7348c17194ec5b9fc99583f8ea7fc1d7e0c85201595361ea6","title":"Global view settings - hierarchy, dependency, and warning alerts","path":"/wbs-gantt-chart-for-jira-data-center/global-view-settings-hierarchy-dependency-and-warn","children":[]},{"id":"ci_3b6c1449c3faca827ed043ccb2a48027776efd247ed7e1b5bfd4d74ceb1911cb","title":"Global job scheduler settings - aggregating/reflecting time tracking and calculating progress rate","path":"/wbs-gantt-chart-for-jira-data-center/global-job-scheduler-settings-aggregating-reflecti","children":[]},{"id":"ci_4feb00b72952b45f16663d7b783141380572577756e7655f8c3a9f7e8e3e64f2","title":"Global version settings","path":"/wbs-gantt-chart-for-jira-data-center/global-version-settings","children":[]},{"id":"ci_55618d199299b32e7e61642d0320e0aa7f7d2d412fc0d1cdbe026b99983ff664","title":"Global column settings","path":"/wbs-gantt-chart-for-jira-data-center/global-column-settings","children":[]},{"id":"ci_548d4916013d45e83ec8afab73819174b5a3a32eb682a9054a02e5ecc9bcd73e","title":"Global holiday calendar settings","path":"/wbs-gantt-chart-for-jira-data-center/global-holiday-calendar-settings","children":[]}]},{"id":"ci_1b2c8965ebb55cab17f9e15c082bc8f58b08a2451149d430a674fe168c8a3c55","title":"Jira custom field, issue type, and issue link created by WBS Gantt-Chart for Jira","path":"/wbs-gantt-chart-for-jira-data-center/jira-custom-field-issue-type-and-issue-link-create","children":[]},{"id":"ci_b308a733cf994a003e8d1060c419330019bb37ce08b7b2ebac10afb1629e2b2f","title":"Analytics settings","path":"/wbs-gantt-chart-for-jira-data-center/analytics-settings","children":[]},{"id":"ci_9d411ef8c40c8490667a24e7e71f0ed590e959e4070701080ef6292a627b9e56","title":"Permission settings","path":"/wbs-gantt-chart-for-jira-data-center/permission-settings","children":[]}]},{"id":"ci_1413ee2c54a52fd88476c9cc78314d0c2e512ca6f87dcbf20861b23d58b37b48","title":"Gantt settings - guide for project managers","path":"/wbs-gantt-chart-for-jira-data-center/gantt-settings-guide-for-project-managers","children":[{"id":"ci_1d06234f6cdd99e42a6927fa77543f5d56278034678610b42be4f195beab6ab2","title":"Managing an issue template","path":"/wbs-gantt-chart-for-jira-data-center/managing-an-issue-template","children":[]},{"id":"ci_906c94e54ee1a9b338ea89bd15415767e7db62acce5b331cf3d41b61fcab65fb","title":"Gantt general settings","path":"/wbs-gantt-chart-for-jira-data-center/gantt-general-settings","children":[]},{"id":"ci_80cd27325349282ecc49b884893d3f22d1486695520b9bc6de1d7776b0f2bd38","title":"Gantt color settings","path":"/wbs-gantt-chart-for-jira-data-center/gantt-color-settings","children":[]},{"id":"ci_aee35b4394407db8e6eb895c58628b419651c96296f46c16e8a4b63880bb1ca2","title":"Gantt issue view settings - display mode, start/finish date, and percent done","path":"/wbs-gantt-chart-for-jira-data-center/gantt-issue-view-settings-display-mode-start-finis","children":[]},{"id":"ci_2c15e7c59f7cf0454462aa6d7a62eac27a6ff17d5340a729895e3d016cd4e33d","title":"Creating and editing versions","path":"/wbs-gantt-chart-for-jira-data-center/creating-and-editing-versions","children":[]},{"id":"ci_f9a3020f0af8b9be5f387f9ba37115105050857c2842ed6ed565b4be61a8b99f","title":"Gantt column settings","path":"/wbs-gantt-chart-for-jira-data-center/gantt-column-settings","children":[]},{"id":"ci_3fb314f3fd38658f1bfab85fddc7ece05ae38f54954073196d49cd1412688534","title":"Gantt holiday calendar settings","path":"/wbs-gantt-chart-for-jira-data-center/gantt-holiday-calendar-settings","children":[]},{"id":"ci_2456be0bf7e593e4c5f2b26cc1834da9e1cd89965c315b50a540fe78e7e9c577","title":"Gantt version settings","path":"/wbs-gantt-chart-for-jira-data-center/gantt-version-settings","children":[]},{"id":"ci_22e20e5808efdcbb276c8ce0f235e8921b5e043786a4a0648cf76501c735b472","title":"Gantt view settings - hierarchy, dependency, and warning alerts","path":"/wbs-gantt-chart-for-jira-data-center/gantt-view-settings-hierarchy-dependency-and-warni","children":[]}]},{"id":"ci_5bd06dc663d87c14b9b58ddbef372bb155344b4034581d3de8c157293ccca516","title":"General user guide","path":"/wbs-gantt-chart-for-jira-data-center/general-user-guide","children":[{"id":"ci_eb3e88f44f480bcbaf17f728bb3ce6a51ce969ca29516ad20e506ea3483192c8","title":"Editing","path":"/wbs-gantt-chart-for-jira-data-center/editing","children":[{"id":"ci_dbb84b596afc5df892a805537af3389eec384bde74294a3c403ca0fc86af42ab","title":"Editing in issue detail view","path":"/wbs-gantt-chart-for-jira-data-center/editing-in-issue-detail-view","children":[]},{"id":"ci_8ab8d895097bdc8b2156f09c14966421507ac358d911513e83686b6e66458d82","title":"Creating, copying, or deleting an issue","path":"/wbs-gantt-chart-for-jira-data-center/creating-copying-or-deleting-an-issue","children":[]},{"id":"ci_d28af4c44abab0219e633dde64a1cd2b120bab34c48d0427e37ada3a4225a8a9","title":"Create, edit, and delete dependency","path":"/wbs-gantt-chart-for-jira-data-center/create-edit-and-delete-dependency","children":[]},{"id":"ci_1e0c205a89ded4a6c3791a8d543486d6a83c047c599d0d361275adeb540698ae","title":"Creating plans, baselines, and due dates","path":"/wbs-gantt-chart-for-jira-data-center/creating-plans-baselines-and-due-dates","children":[]},{"id":"ci_20a2bcf51423280e55c5a9a107586b481d888c65b94fc70443205f8bd8ada9ea","title":"Updating and calculating the progress rate (percent done)","path":"/wbs-gantt-chart-for-jira-data-center/updating-and-calculating-the-progress-rate-percent","children":[]},{"id":"ci_07e7cae9b11ef0c27377d6d4cfa3fddceab6d93ee68b2a7a417b672a9a99a3db","title":"Editing the WBS display","path":"/wbs-gantt-chart-for-jira-data-center/editing-the-wbs-display","children":[]}]},{"id":"ci_93b82a2418b4951073569cb527a4c9ea66ddc2e1ca60ee64ffa73a28333da6e2","title":"Changing settings","path":"/wbs-gantt-chart-for-jira-data-center/changing-settings","children":[]},{"id":"ci_35fefe898d11f2073c526fb0c79f468000ed57af922c09423208274c5a0b6397","title":"Tips for advanced users","path":"/wbs-gantt-chart-for-jira-data-center/tips-for-advanced-users","children":[{"id":"ci_4c08d8aae1d8ca112045d2a6a922ac0e68b4600f652a1ff00a6ab639d301b3f1","title":"List of keyboard shortcuts","path":"/wbs-gantt-chart-for-jira-data-center/list-of-keyboard-shortcuts","children":[]},{"id":"ci_f89d0cd2afaa7be948ca639ec9b851f39af6c434b4dd4563ab3dd47d96d094d3","title":"Exporting to Excel","path":"/wbs-gantt-chart-for-jira-data-center/exporting-to-excel","children":[]},{"id":"ci_3c0d6bc82f48283cb5be8245e7af50a98ceb17dc19a5578b52ba7cd62341741e","title":"Importing from Microsoft Project","path":"/wbs-gantt-chart-for-jira-data-center/importing-from-microsoft-project","children":[]},{"id":"ci_5b2fcf6a014aa99076882ba2cf90ab3b2580ebd9bf110660cf355567791b352b","title":"Exporting to Microsoft Project","path":"/wbs-gantt-chart-for-jira-data-center/exporting-to-microsoft-project","children":[]},{"id":"ci_033f2841322810318ad8c5441f523db99f75aa04ef0f9bce19fef627342caad8","title":"Launching Excel-like Issue Editor for Jira","path":"/wbs-gantt-chart-for-jira-data-center/launching-excel-like-issue-editor-for-jira","children":[]},{"id":"ci_daa86b8bd0ee4e6baf6ac4af597278184261715e57c93d44cfb029f8fe3fa61e","title":"Distinguishing issue templates and subordinate issues ","path":"/wbs-gantt-chart-for-jira-data-center/distinguishing-issue-templates-and-subordinate-iss","children":[]}]},{"id":"ci_87faf8afb57f6d75701dace4bdf420727c57def905328964cf5f26f370b6bcc5","title":"Information on analysis tools and functions","path":"/wbs-gantt-chart-for-jira-data-center/information-on-analysis-tools-and-functions","children":[]},{"id":"ci_5cca8ca0d87ea8177d3fddcf41ecb38b0ca133c3eee8c1c1a5e3c1e87bf67b62","title":"Basic Operation","path":"/wbs-gantt-chart-for-jira-data-center/basic-operation","children":[{"id":"ci_8de6c8a9d1e8b59ee552e7571e388db2b126c93ee1de718d90cb0ea38cf9b91c","title":"General user information","path":"/wbs-gantt-chart-for-jira-data-center/general-user-information","children":[]},{"id":"ci_ae1f80762da432885ae8c408f4c40f0ae86f416a1877525f02eec3a026e7289f","title":"Information on the Gantt chart display","path":"/wbs-gantt-chart-for-jira-data-center/information-on-the-gantt-chart-display","children":[]},{"id":"ci_d60f43cdb5377b37b108ab925b3bd815a113a2dda29e091f53aeed09a3f6fee0","title":"Information on the WBS display","path":"/wbs-gantt-chart-for-jira-data-center/information-on-the-wbs-display","children":[]}]}]},{"id":"ci_d222c496128bb2ed76acc1a399e8a890c86ba4a5c6b303c4924146299e76d2b9","title":"Tutorial: Getting started as a system administrator","path":"/wbs-gantt-chart-for-jira-data-center/tutorial-getting-started-as-a-system-administrator","children":[{"id":"ci_4f4cdb34359ec7c3a0573fbdd57e91358dd9db663ffcd66e83cadec895804e35","title":"Configuring the maximum number of displayable issues","path":"/wbs-gantt-chart-for-jira-data-center/configuring-the-maximum-number-of-displayable-issu","children":[]}]},{"id":"ci_0d6c5058b68540f99772eb7fb4d893e046f24174b7701d3c294d8a0938a7165c","title":"Tutorial: Getting started as a project manager","path":"/wbs-gantt-chart-for-jira-data-center/tutorial-getting-started-as-a-project-manager","children":[{"id":"ci_64b36e39403c74014c4c6d174d3c14f6f8f88b2be0c0051d8bc1242664713d57","title":"Creating a plan","path":"/wbs-gantt-chart-for-jira-data-center/creating-a-plan","children":[]},{"id":"ci_b729aab213439cb66a7a7bad0f8b32e5443d89a820eda650a217e80426adf951","title":"Assigning resources","path":"/wbs-gantt-chart-for-jira-data-center/assigning-resources","children":[]},{"id":"ci_8e5a2a4ac1569b14d3e6b2be4305342143ad7de13cc67b124d962be787bc957a","title":"Creating a Gantt","path":"/wbs-gantt-chart-for-jira-data-center/creating-a-gantt","children":[]},{"id":"ci_dd98d9b113bcb4dbf48c7b86f87ea6fd6526614e5e8ab7438c90d74bb5619dd6","title":"Implementing your plan","path":"/wbs-gantt-chart-for-jira-data-center/implementing-your-plan","children":[]},{"id":"ci_4ec3a874e3475104e261511aac7b58ebe0a35ecbcb5455ebf04cb1ec791b9a51","title":"Confirming the plan","path":"/wbs-gantt-chart-for-jira-data-center/confirming-the-plan","children":[]},{"id":"ci_ce94a971380efb1d3047573d1b8a25981ce63dbc539ceb811ffab476e108db7a","title":"Creating a WBS","path":"/wbs-gantt-chart-for-jira-data-center/creating-a-wbs","children":[]},{"id":"ci_7def15f4c6e4c92a88b82bacd4254b8c1a5aa556e1225416dbd81440ffba82ca","title":"Configuring Gantt settings","path":"/wbs-gantt-chart-for-jira-data-center/configuring-gantt-settings","children":[{"id":"ci_530e55eb78b08066a402d0a6455f39b7565be14d2168facba39d68f41fd155cd","title":"Configuring the progress rate","path":"/wbs-gantt-chart-for-jira-data-center/configuring-the-progress-rate","children":[]},{"id":"ci_00b6465ff7e48a726e319dd6574cfabc3924334cf50cd3c43029b2e5388e77c1","title":"Configuring version settings","path":"/wbs-gantt-chart-for-jira-data-center/configuring-version-settings","children":[]},{"id":"ci_d941eb63190eb186cb719b0f4917acf5d4ef7fded8a5c05d219aecf9f4b44403","title":"Configuring additional columns","path":"/wbs-gantt-chart-for-jira-data-center/configuring-additional-columns","children":[]},{"id":"ci_4b3249c2f4c7cd6951324473b011dfd5b6c52a4d66fe772fe94f28419438dbf1","title":"Configuring the holiday calendar","path":"/wbs-gantt-chart-for-jira-data-center/configuring-the-holiday-calendar","children":[]}]}]},{"id":"ci_dc1e298972e5d737e6daa621d6fcf95f8f477202099d8ff14f34a1ef044d5d60","title":"Tutorial: Getting started as a project member","path":"/wbs-gantt-chart-for-jira-data-center/tutorial-getting-started-as-a-project-member","children":[{"id":"ci_2d620db0433bdf9721a58eaa3bc7da7124e8e2f29bff4af624c5fd1237b2a0c3","title":"Verifying assigned issues","path":"/wbs-gantt-chart-for-jira-data-center/verifying-assigned-issues","children":[]},{"id":"ci_ab269529471f89a5b2006f3eb18f1be7e188594d18995d20ce49d0d6f127c484","title":"Finding issues with tasks to be done","path":"/wbs-gantt-chart-for-jira-data-center/finding-issues-with-tasks-to-be-done","children":[]},{"id":"ci_c965f6f10d303c80b94209cb49c48ef4ed86c0a0231eb3c1fd270dafc1f89df3","title":"Input task results","path":"/wbs-gantt-chart-for-jira-data-center/input-task-results","children":[]}]},{"id":"ci_ebf0020365ab79d259e0922aa87cd0d7b5637905c7c02451012db48f403982cf","title":"Any  questions?","path":"/wbs-gantt-chart-for-jira-data-center/any-questions","children":[]},{"id":"ci_62516bbbb58e022ff12a66484cfc33b9fccd8dcdd69610e6a237140728bcefee","title":"Tips","path":"/wbs-gantt-chart-for-jira-data-center/tips","children":[{"id":"ci_1437ddcfeba6fe48d66c402d5d6421dc2b9310d244132d91dbeafb3753f11f0a","title":"Suggestions for new features and improvements","path":"/wbs-gantt-chart-for-jira-data-center/suggestions-for-new-features-and-improvements","children":[]},{"id":"ci_f1697d5223e51320faac0896266500b0f207375811b860f022ce766427dd4fde","title":"How to migrate WBS Gantt-Chart from Server / Data Center to Cloud","path":"/wbs-gantt-chart-for-jira-data-center/how-to-migrate-wbs-gantt-chart-from-server-data-ce","children":[]},{"id":"ci_4eb3f4feb9bf8ca7e739fc457fcfedbbde689bbe4a1d542ea574f94e8f7dcb1a","title":"How to migrate WBS Gantt-Chart from Server to Data Center","path":"/wbs-gantt-chart-for-jira-data-center/how-to-migrate-wbs-gantt-chart-from-server-to-data","children":[]},{"id":"ci_7db2bb925cbedf76d70302d0cf208c4d8bdea30b2ec24c172d0a07284685df40","title":"Comparison chart between Cloud and Server/Data Center","path":"/wbs-gantt-chart-for-jira-data-center/comparison-chart-between-cloud-and-server-data-cen","children":[]},{"id":"ci_25a14796c141bae5190d9e8d63f99196580fe4c84e5c8428d36b6613a1575df8","title":"Ricksoft Translations","path":"/wbs-gantt-chart-for-jira-data-center/ricksoft-translations","children":[]},{"id":"ci_c07cb9d629593b64e951e16294e467e41ac338e03e3055557cf9749fcb48aae0","title":"Documentation for Previous Versions","path":"/wbs-gantt-chart-for-jira-data-center/documentation-for-previous-versions","children":[]}]},{"id":"ci_ea4c2008ab9ed4a3b88a98d547c9e11e66532bc2691e4175c53ac34f10f86fe8","title":"WBS Gantt-Chart for Jira Server: Knowledge base and workarounds","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-server-knowledge-base-and","children":[{"id":"ci_35608ff3202eed14c111f99b261d648f503bf3575c85be78341e03a5afc55b05","title":"Can I extend my free trial of WBS Gantt-Chart for Jira Data Center?","path":"/wbs-gantt-chart-for-jira-data-center/can-i-extend-my-free-trial-of-wbs-gantt-chart-for-","children":[]},{"id":"ci_0a31798a28ebc36d8c01114143e7f974780a97cd2f0e3368386067403d26ab1b","title":"Can I purchase a Marketplace app at a User Tier other than that of the parent product?","path":"/wbs-gantt-chart-for-jira-data-center/can-i-purchase-a-marketplace-app-at-a-user-tier-ot","children":[]},{"id":"ci_120a3b22f261ca1b966468d90955747772f8d0c3d98c105d914044b7911a9e59","title":"How to hide the summary and assignee name from the chart?","path":"/wbs-gantt-chart-for-jira-data-center/how-to-hide-the-summary-and-assignee-name-from-the","children":[]},{"id":"ci_f21fefcad1e5b006b2257f94d7295100fe1bd47196b8bce1ea2da3e5f2d52302","title":"I want to disable a module of WBS Gantt-Chart. Is it possible?","path":"/wbs-gantt-chart-for-jira-data-center/i-want-to-disable-a-module-of-wbs-gantt-chart-is-i","children":[]},{"id":"ci_9fd4eb0d00e7f8f4b77c9290c534308dd94875e0a6b2d96e91230ae7e59ff570","title":"Can I get a refund, exchange or upgrade after purchasing a server product license?","path":"/wbs-gantt-chart-for-jira-data-center/can-i-get-a-refund-exchange-or-upgrade-after-purch","children":[]},{"id":"ci_c10b8bdc65e4cb325246ee24a75cbf11bd4603a51b8352c34ab3ea6994e41d94","title":"\"Automatically set the progress rate to 100% if the problem is solved\" and \"Automatically set the progress rate to 0% if you reopen the assignment?\" are not in the Gantt setting, why is that?","path":"/wbs-gantt-chart-for-jira-data-center/automatically-set-the-progress-rate-to-100-if-the-","children":[]},{"id":"ci_815d191e2004cd0778fa530e2a5d878ef9de31326d869cc3727e15ed40f77e8e","title":"After upgrading to version 9.7.0 or later, you can not use some features","path":"/wbs-gantt-chart-for-jira-data-center/after-upgrading-to-version-9-7-0-or-later-you-can-","children":[]},{"id":"ci_28859d673a2bbf3dc659532dc55c3c275899b1f75444e61966402bfb0aea17d5","title":"Child issues not displayed in WBS Gantt-Chart after a version is deleted?","path":"/wbs-gantt-chart-for-jira-data-center/child-issues-not-displayed-in-wbs-gantt-chart-afte","children":[]},{"id":"ci_1182320783e9d1ba2a3052f36dbad36b53b526d32d00a6bd500de74215019549","title":"How do I determine my server pricing?","path":"/wbs-gantt-chart-for-jira-data-center/how-do-i-determine-my-server-pricing","children":[]},{"id":"ci_4829cca9fd5ae4ac1404e07f78313b1fb18da93cf3523beadf542d65084aaff4","title":"How to disable the Create Story and Create Epic options on a Project?","path":"/wbs-gantt-chart-for-jira-data-center/how-to-disable-the-create-story-and-create-epic-op","children":[]},{"id":"ci_9574308164ac60425a767eb4a2ec060f1d2e39880f98f45f5c490a7a23921b80","title":"Is WBS Gantt-Chart for Jira available at Atlassian Cloud?","path":"/wbs-gantt-chart-for-jira-data-center/is-wbs-gantt-chart-for-jira-available-at-atlassian","children":[]},{"id":"ci_4d70b2872ca23ec9378ca8837cbf7d4390a2b6c084c16fe03bd6767a13cbb473","title":"Issue template and phase icons not displayed?","path":"/wbs-gantt-chart-for-jira-data-center/issue-template-and-phase-icons-not-displayed","children":[]},{"id":"ci_c5d738e371ee053e33d990d8bce31a9caa8377c647f3b09bce0fc0571f4701fd","title":"Presence of product logo next to Gantt chart name","path":"/wbs-gantt-chart-for-jira-data-center/presence-of-product-logo-next-to-gantt-chart-name","children":[]},{"id":"ci_9f6566b73afac01bbdd09063d98dd7b019897ba9598eb4acf3047feb2bb87236","title":"Unable to display WBS and Gantt chart?","path":"/wbs-gantt-chart-for-jira-data-center/unable-to-display-wbs-and-gantt-chart","children":[]},{"id":"ci_0827304bf6c05d8e3548a658734e601c1338daa02d87b35d8210d587b2107a2a","title":"Users of Version x.x.x6a or earlier may lose data if they do not uninstall first","path":"/wbs-gantt-chart-for-jira-data-center/users-of-version-x-x-x6a-or-earlier-may-lose-data-","children":[]},{"id":"ci_6dd37d94af2a9ecdfaa6e98af65d5cc04343aba658df6973078bdb42d7d275f1","title":"Version details not displayed in exported WBS Gantt-Chart versions?","path":"/wbs-gantt-chart-for-jira-data-center/version-details-not-displayed-in-exported-wbs-gant","children":[]},{"id":"ci_307e10113d6ba83bff542f90d4370bdb63ce4febc104b27a4d495ffdb758babb","title":"What are the supported platforms?","path":"/wbs-gantt-chart-for-jira-data-center/what-are-the-supported-platforms","children":[]},{"id":"ci_1d9d8d20f43083acf32a6bbc5b5e2d005a8396c15c0d3e786b1714fc36e13c32","title":"Whenever I export the current Gantt, the resulting excel file is full of Japanese signs (weeks, days, month) where there weren't when viewed in Jira.","path":"/wbs-gantt-chart-for-jira-data-center/whenever-i-export-the-current-gantt-the-resulting-","children":[]},{"id":"ci_1f752a7685c3de7727c1826c40bed9e55c9c577ae21c9204a4ec5dc9229f71d6","title":"Is there any principle for the Gantt chart's bar color?","path":"/wbs-gantt-chart-for-jira-data-center/is-there-any-principle-for-the-gantt-chart-s-bar-c","children":[]},{"id":"ci_5c0e141fa634bceef6f1953205fad90f86005c6179d41f6f98b73110db0bc3ee","title":"Can I get a demo? Do you have traditional sales whom I can talk?","path":"/wbs-gantt-chart-for-jira-data-center/can-i-get-a-demo-do-you-have-traditional-sales-who","children":[]},{"id":"ci_4f12d62ccd845775f060c5ea142c29d4a545daa93f2a3cdd491bc2cbaf3c86ef","title":"How to set Start Date when the issue is created","path":"/wbs-gantt-chart-for-jira-data-center/how-to-set-start-date-when-the-issue-is-created","children":[]},{"id":"ci_9525f27d030ee08997c0dde76893f2da45934ad23bd6631fe306c4947a3f54ac","title":"How to use Jira Links instead of WBS Gantt-Chart ones?","path":"/wbs-gantt-chart-for-jira-data-center/how-to-use-jira-links-instead-of-wbs-gantt-chart-o","children":[]},{"id":"ci_a91676d032e954fd5ed59f6ca125da2f7d69d2026af6c497e19872758c1067f7","title":"Is there a way to display WBS Gantt-Chart for Jira on the Confluence page?","path":"/wbs-gantt-chart-for-jira-data-center/is-there-a-way-to-display-wbs-gantt-chart-for-jira","children":[]},{"id":"ci_ee3041b91f151e0e25863cfe7436876e1612894a532a03cf74f4636cbc1356bb","title":"Multiple WBS Gantt-Chart links displayed in administration add-on screen?","path":"/wbs-gantt-chart-for-jira-data-center/multiple-wbs-gantt-chart-links-displayed-in-admini","children":[]},{"id":"ci_27e9e5f70b025f6f38adead93f5eff5793b54f977e247a86aea40c7d46318ee4","title":"Can WBS Gantt-Chart for Jira be used as a standalone product?","path":"/wbs-gantt-chart-for-jira-data-center/can-wbs-gantt-chart-for-jira-be-used-as-a-standalo","children":[]},{"id":"ci_314600fcb71c90f9969de3f2866dee9f49d7144e565e257c3fc581e17bebdfb3","title":"Can we restrict the usage/appearance of the plugin?","path":"/wbs-gantt-chart-for-jira-data-center/can-we-restrict-the-usage-appearance-of-the-plugin","children":[]},{"id":"ci_f5f1758c3faea561d32778a1656b60e8fe336f14493740ab95f9d7196fc9de55","title":"Does Ricksoft provide any discounts for the Government?","path":"/wbs-gantt-chart-for-jira-data-center/does-ricksoft-provide-any-discounts-for-the-govern","children":[]},{"id":"ci_d6cb4d3f17433517d4d4fa3b102946b34518b54fce4ce4f168abd9cdd34c6ea5","title":"How can I specify the individual schedule? It seems that it can only apply global calendar which everyone shares.","path":"/wbs-gantt-chart-for-jira-data-center/how-can-i-specify-the-individual-schedule-it-seems","children":[]},{"id":"ci_8f4c50a3cb980c5397b2a2bcab2bdccf85c62ed35ef56a75a4bacec2fa5f3672","title":"How do I reset all settings to the factory default settings and start again?","path":"/wbs-gantt-chart-for-jira-data-center/how-do-i-reset-all-settings-to-the-factory-default","children":[]},{"id":"ci_50564851a4d197434ef7f3b7e81f75693908cc5c168224b7d7a890961d0b0305","title":"How is the percent done (progress rate) of parent issues calculated?","path":"/wbs-gantt-chart-for-jira-data-center/how-is-the-percent-done-progress-rate-of-parent-is","children":[]},{"id":"ci_7ee9ed54586b4f7b4bf027ae4788ddd577b6f63160d21b5945841b8c3aeb4b47","title":"How to hide completed issues on Gantt chart?","path":"/wbs-gantt-chart-for-jira-data-center/how-to-hide-completed-issues-on-gantt-chart","children":[]},{"id":"ci_1eed71b05ffc06aba0482a21753272ddf43c01fc49d1b2c1f84a4660babb3a46","title":"How to manage resources across multiple projects?","path":"/wbs-gantt-chart-for-jira-data-center/how-to-manage-resources-across-multiple-projects","children":[]},{"id":"ci_ba79f6a65419a7c77207b5b0d9fe2b2bccfb2413f71419c8a25835935147aa86","title":"Is it built to allow filtering in the columns of Gantt view?","path":"/wbs-gantt-chart-for-jira-data-center/is-it-built-to-allow-filtering-in-the-columns-of-g","children":[]},{"id":"ci_168e901dc6968d5656716cfc91acbd7a42cc3b273c5507bcf2f7eef570ab4a6a","title":"Is it possible to display a list of the dependencies for a task (i.e., the links) in a column?","path":"/wbs-gantt-chart-for-jira-data-center/is-it-possible-to-display-a-list-of-the-dependenci","children":[]},{"id":"ci_f815631bf57fdfd57422763e080cede182673faac6862e73e5bbc1cf7f0bfdd7","title":"Is it possible to export the Gantt charts in a different format? For example, in the Microsoft Project format.","path":"/wbs-gantt-chart-for-jira-data-center/is-it-possible-to-export-the-gantt-charts-in-a-dif","children":[]},{"id":"ci_e4abeeb782b81d35d40fb26ead774e64dd573aaea21097c4fccb50417969b660","title":"Is it possible to make a Gantt public to others?","path":"/wbs-gantt-chart-for-jira-data-center/is-it-possible-to-make-a-gantt-public-to-others","children":[]},{"id":"ci_c7877f5e2a4f3271261d66f4042341518a8f3b3a2e057111d8ec1d6bc1931bba","title":"Is it possible to manage your plans in hour unit?","path":"/wbs-gantt-chart-for-jira-data-center/is-it-possible-to-manage-your-plans-in-hour-unit","children":[]},{"id":"ci_9101a0dcb3bf1cc30cc552276252ce568a37771e4595c3bcc22329ed49179e6d","title":"Is there a setting to hide issue you do not want to display or no need for displaying?","path":"/wbs-gantt-chart-for-jira-data-center/is-there-a-setting-to-hide-issue-you-do-not-want-t","children":[]},{"id":"ci_0944dacde90822697fde3d2ec96b0b7ae0ef7673c05493da4540d77981360523","title":"The warning alerts are kept displaying even we have resolved the issues.","path":"/wbs-gantt-chart-for-jira-data-center/the-warning-alerts-are-kept-displaying-even-we-hav","children":[]},{"id":"ci_c0834f577177407a7df3c8ce50d56fd4e3bf5a30d0c6c8ed79dd8d2b980553aa","title":"Why \"Add > Successor issue\" is grayed out and can not be selected?","path":"/wbs-gantt-chart-for-jira-data-center/why-add-successor-issue-is-grayed-out-and-can-not-","children":[]},{"id":"ci_a4a027dbe95edb2af2c4782766e42186cf2434c8fdad8a0022ff8e00ecca35ef","title":"Why the Auto Percent Done modify all the issues on my WBS Gantt-Chart?","path":"/wbs-gantt-chart-for-jira-data-center/why-the-auto-percent-done-modify-all-the-issues-on","children":[]},{"id":"ci_9313248545d80de737b3570bcb520fc1b513d1cfd27bc382a485dc18391f025e","title":"Why do I get redirected to “Manage apps” screen when I click on WBS Gantt-Chart menu?","path":"/wbs-gantt-chart-for-jira-data-center/why-does-clicking-on-wbs-gantt-chart-menu-redirect","children":[]},{"id":"ci_f9f949cba61314eaf9ca40bb8d83c8418e03ffbffd74d419e5847eca0761bb64","title":"What happens to WBS Gantt-Chart for Jira when changing a project key?","path":"/wbs-gantt-chart-for-jira-data-center/what-happens-to-wbs-gantt-chart-for-jira-when-chan","children":[]}]},{"id":"ci_4c2234807364fc37eb42e7b10c424a25577229da8f6229ab97ba9fd83cf00f55","title":"Video tutorials: Getting started with WBS Gantt-Chart for Jira","path":"/wbs-gantt-chart-for-jira-data-center/video-tutorials-getting-started-with-wbs-gantt-cha","children":[]},{"id":"ci_077d23774eafef42488072178c06d60be1bdac59db0db8c3e3c7096dae9de4a2","title":"Release notes","path":"/wbs-gantt-chart-for-jira-data-center/release-notes","children":[{"id":"ci_9ce430c2a2a277a29f955026ad8575b398195c9aba12c39e9567e857edf5be6b","title":"WBS Gantt-Chart for Jira 9.19.1 ~","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9-19-1","children":[]},{"id":"ci_1c7a2c097edae273efbafbdfd904a8439d2d3637f65ae01b535033b4c7f92720","title":"WBS Gantt-Chart for Jira 9.19.0 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9-19-0-release-notes","children":[]},{"id":"ci_3a77d4486d5119c1ea3b03f5e3bf87028b649c99cca702653f281edda9ffd945","title":"WBS Gantt-Chart for Jira 9.18.6 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9-18-6-release-notes","children":[]},{"id":"ci_93cb84d3657137d4ce036093e45086372a3c5816c6616745e23705653b06b9bc","title":"WBS Gantt-Chart for Jira 9.18.4 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.18.4-release-notes","children":[]},{"id":"ci_cc376724c6047f8c908a500ed63e2ff39e168ec50a02daf48dab339aacd50d0a","title":"WBS Gantt-Chart for Jira 9.18.3 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.18.3-release-notes","children":[]},{"id":"ci_588ae1e89fcca6909b489a68672d4eeada1613bedae47185e158ee8020198db7","title":"WBS Gantt-Chart for Jira 9.18.2 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.18.2-release-notes","children":[]},{"id":"ci_bc8cc59cb28119e8b6531966691e8e069382241e9a43a756ea425af66a348d7a","title":"WBS Gantt-Chart for Jira 9.18.1 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.18.1-release-notes","children":[]},{"id":"ci_77bb02c957de294df82a97cbf97799d19f29f857debbc2fb39ab2be23501fc1d","title":"WBS Gantt-Chart for Jira 9.18.0 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.18.0-release-notes","children":[]},{"id":"ci_3e2d161ed293c3b267c9002da2877a3bfab5d6bb28857bb6579a9c04e06c6737","title":"WBS Gantt-Chart for Jira 9.17.2 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.17.2-release-notes","children":[]},{"id":"ci_0f1037c19095a232126e4c34b8354e12b5eee6419685ccdb3cd64ece998146db","title":"WBS Gantt-Chart for Jira 9.17.1 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.17.1-release-notes","children":[]},{"id":"ci_4a7e1258499e93f3d28166b2b0164bc2529207ebb6bf6867c5ef057853d2a045","title":"WBS Gantt-Chart for Jira 9.17.0 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.17.0-release-notes","children":[]},{"id":"ci_e3101706a75c7ac1398ef1843c43b814a85d3ae8e557232d82191d2d3a4b3c59","title":"WBS Gantt-Chart for Jira 9.16.3 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.16.3-release-notes","children":[]},{"id":"ci_e10f626f2861fd225c72c41f2ba737df2d8725d0c05045c36359b1cd2d07115d","title":"WBS Gantt-Chart for Jira 9.16.2 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.16.2-release-notes","children":[]},{"id":"ci_224eb1ba3ec9b255e64d631c7cb59fcfb63233ec1b0e96c550320900334c0ba6","title":"WBS Gantt-Chart for Jira 9.16.1 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.16.1-release-notes","children":[]},{"id":"ci_cc70a15450e38a04f61d8ac8533cfbf817b046a1af1a8f3e1cf3099b8fb35125","title":"WBS Gantt-Chart for Jira 9.16.0 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.16.0-release-notes","children":[]},{"id":"ci_01c7e6478a063171c8e17ee52c2a50d9e1bf9a40b9cec934318453731f87aedc","title":"WBS Gantt-Chart for Jira 9.15.2 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.15.2-release-notes","children":[]},{"id":"ci_13fbad92f30aa4a6086a5eeaac117c8db7df39a8e47e99d18842ee883bafbda4","title":"WBS Gantt-Chart for Jira 9.15.1 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.15.1-release-notes","children":[]},{"id":"ci_0c649ebdf0cf0b35180419a35ff680e609a7732736850ddf53b4f45b40593420","title":"WBS Gantt-Chart for Jira 9.15.0 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.15.0-release-notes","children":[]},{"id":"ci_e89bc6eeb0b745e61230094c91eea982596a0bf28af1b8abb8c3e28e1cb04716","title":"WBS Gantt-Chart for Jira 9.14.0 release notes","path":"/wbs-gantt-chart-for-jira-data-center/wbs-gantt-chart-for-jira-9.14.0-release-notes","children":[]}]},{"id":"ci_b6fd9429767212c8173462f1aa0abef4c29f63ffcd4e98f0b7c9a3a926880af3","title":"Does Ricksoft offer any discounts?","path":"/wbs-gantt-chart-for-jira-data-center/does-ricksoft-offer-any-discounts","children":[]},{"id":"ci_629ed9ad8a538453b0cb5dea36561d0d66cb2c9bdcf84dd9dd79f0e12c51391e","title":"[DRAFT] 31. What are the Orange lines in my Gantt?","path":"/wbs-gantt-chart-for-jira-data-center/draft-31-what-are-the-orange-lines-in-my-gantt","children":[]},{"id":"ci_eff48b4db5bc0893820f3948b7fa259f479deab7a8154a70c8dd2b8003947fc1","title":"[DRAFT] 34. Creating a Gantt [Update-DC]","path":"/wbs-gantt-chart-for-jira-data-center/draft-34-creating-a-gantt-update-dc","children":[]}]